Index / Government memos Government memo
Independent government estimate to replace MCC New York camera system An independent government estimate for replacing the MCC New York camera system, totaling $800,000 in contract and in-house labor costs.Machine-written summary
EFTA00141792¶
Independent Government Estimate (IGE)¶
Institution: MCC New York Project Title: Replace Camera System Category Object Class Man-Hours 25 (Contract) 26 (In-House) 1 General Requirements 2 Sitework 3 Concrete 4 Masonry 5 Metals a. Structural b. Miscellaneous 6 Wood & Plastic 7 Thermal & Moisture Protection a. Insulation 8 Doors & Windows 9 Finishes a. Paint b. Flooring c. Ceiling d. Other 10 Specialties 11 Equipment (See Attachment) 12 Furnishings 13 Special Construction 14 Conveying Systems 15 Mechanical a. Plumbing b. HVAC 16 Electrical a. Primary b. Secondary $32,578.75 400.00 c. Lighting d. Communications $767,421.25 400.00 TOTALS: $767,421.25 600.00 Grand Total: $800,000
Length 1 page
Released in DOJ Epstein Files, Data Set 9
Reference EFTA00141792 About this text This text comes from ishumilin/epstein-files-ocr-complete (Hugging Face) (license: CC0-1.0). View source
Text read by software from scanned pages can contain errors. The original PDF is the authority. Report a problem .
Other documents from the same file These documents were released together, in one file.
and 2 more in the same file.
Independent government estimate to replace MCC New York camera system Government memos
An independent government estimate for replacing the MCC New York camera system, totaling $800,000 in contract and in-house labor costs.
DOJ Epstein Files, Data Set 9
EFTA00141792 Independent Government Estimate (IGE) <table <thead <tr <th colspan="2" Institution:</th <th MCC New York</th <th Project Title:</th <th colspan="3" Replace Camera System</th </tr <tr <th rowspan="2" colspan="3" Category</th <th colspan="2" Object Class</th <th rowspan="2" Man-Hours</th </tr <tr <th 25 (Contract)</th <th 26 (In-House)</th </tr </thead <tbody <tr <td 1</td <td colspan="2" General Requirements</td <td colspan="2" </td <td </td <td </td </tr <tr <td 2</td <td colspan="2" Sitework</td <td colspan="2" </td <td </td <td </td </tr <tr <td 3</td <td colspan="2" Concrete</…
Retrieved from https://epstein-index.org/documents/ds9-efta00141792/.