Record · 2013

Building maintenance schedules for fire safety, sewage ejector, and generator

Property maintenance checklists for Epstein's building covering fire safety systems, sewage ejector, and emergency generator upkeep.Machine-written summary

Fire Safety System Daily Schedule

  1. Check fire command station 1st bldg office daily. Monthly Schedule
  2. Check main fire pump.
  3. Check sprinkler pump.
  4. Check hall hose cabinet.
  5. Check outside Siamese connection.
  6. Check roof manifold.
  7. Inspect Stand Pipe Sprinkler per NYC law.
  8. Check fire exit.
  9. Fill out stand pipe and sprinkler inspection log for New York Fire Dept. Six Month Schedule
  10. Inspect kitchen ansul system.
  11. Clean smoke alarms throughout the entire residence, Annual Schedule
  12. Clean fire reserve tank.
  13. Check smoke alarms. “The information contained in this document is confidential and is intended only for the use of the authorized recipient. It is the property of Jeffrey Epstein. Unauthorized use, disclosure or copying of this document or any part thereof is strictly prohibited and may be unlawful. © 2013 Jeffrey Epstein - All rights reserved” HOUSE_OVERSIGHT_009824

Sewage Ejector Location: sub cellar, downstairs, left side. Daily Schedule Check daily for proper operation. Weekly Schedule

  1. Check controls weekly, lift floats, see if pumps are out. Monthly schedule
  2. Treat with Citrus solution sump treatment- Clorox bleach. NOTE: IF NOT MAINTAINED PROPERLY, WILL FLOOD! “The information contained in this document is confidential and is intended only for the use of the authorized recipient. It is the property of Jeffrey Epstein. Unauthorized use, disclosure or copying of this document or any part thereof is strictly prohibited and may be unlawful. © 2013 Jeffrey Epstein - All rights reserved” HOUSE_OVERSIGHT_009825

Emergency Generator

  1. Location above 6th floor fan room.
  2. Check control panel.
  3. Check NICAD battery rack system. Weekly Schedule
  4. Check operation.
  5. Check battery bank. When Needed
  6. Check oil every 200 hours. Note: Refer to white electrical manual for complete preventative maintenance in bldg. office. “The information contained in this document is confidential and is intended only for the use of the authorized recipient. It is the property of Jeffrey Epstein. Unauthorized use, disclosure or copying of this document or any part thereof is strictly prohibited and may be unlawful. © 2013 Jeffrey Epstein - All rights reserved” HOUSE_OVERSIGHT_009826