Keyboard shortcuts

/
Search the files
j k
Move through a list of results
[ ]
Previous or next document
g g · G
Top or bottom of the page
Esc
Leave a search field or close this box
?
Show this box

Go to a page: g then

h
Index
t
Timeline
p
People
r
Redactions
x
Explore
w
News
l
Legislation
a
About

Record · 2013

Chemical treatment system maintenance schedule for Epstein property

Property maintenance schedule for chemical treatment of cooling, chilled water, and heating systems, marked as property of Jeffrey Epstein.Machine-written summary

Chemical Treatment System For condenser/cooling tower, chilled water system, heating hot water, and re heat. Daily Schedule

  1. Check flow of condenser water to chemical feed cylinders.
  2. Check solids floating in the water.
  3. Check conductivity - ppm range - 500 ppm over 1000 ppm.
  4. Blow down system from sump drain.
  5. Check supply and return to chemical feed system in sump. Weekly Schedule
  6. Clean inlet strainer to chemical feed system. Monthly Schedule
  7. Clarity water to test all systems for proper chemical levels, condensing, chilled water, and heating hot water. NOTE: DO NOT HANDLE ANY CHEMICAL WITHOUT PROPER KNOWLEDGE AND LICENSE. REFER TO MATERIAL SAFETY DATA SHEETS! “The information contained in this document is confidential and is intended only for the use of the authorized recipient. It is the property of Jeffrey Epstein. Unauthorized use, disclosure or copying of this document or any part thereof is strictly prohibited and may be unlawful. © 2013 Jeffrey Epstein - All rights reserved” HOUSE_OVERSIGHT_009544

Chemical treatment system maintenance schedule for Epstein property

Other records

Property maintenance schedule for chemical treatment of cooling, chilled water, and heating systems, marked as property of Jeffrey Epstein.

House Oversight: Estate Documents (Oct 17) · 2013

Chemical Treatment System For condenser/cooling tower, chilled water system, heating hot water, and re heat. Daily Schedule 1. Check flow of condenser water to chemical feed cylinders. 2. Check solids floating in the water. 3. Check conductivity - ppm range - 500 ppm over 1000 ppm. 4. Blow down system from sump drain. 5. Check supply and return to chemical feed system in sump. Weekly Schedule 1. Clean inlet strainer to chemical feed system. Monthly Schedule 1. Clarity water to test all systems for proper chemical levels, condensing, chilled water, and heating hot water. NOTE: DO NOT HANDLE ANY…