MCC New York schedule of cost input for asbestos removal, July 2019
A Bureau of Prisons cost form requesting $100,000 to hire a contractor to remove asbestos from MCC New York inmate and visitor areas.Machine-written summary
23.3 Communication, Utilities and Miscellaneous Charges
24.0 Printing and Reproduction
25.0 Other Contract Services
19
100.0
26.0 Supplies and Materials
31.0 Minor Equipment
32.0 Land Structures
Total
100.0
0.0
0.0
Total 100.0
Total in Dollars $100,000.00
Current Conditions
There are multiple areas within the institution that has been identified by NYS certified contractor which contains asbestos. The asbestos files are unintentionally breaking and seperating from the floor in both inmate and visitor ares.
Proposal
MCC New York proposes to hire a contractor to remove all asbestos identified in past and present surveys. The contractor will also inspect, clean, abate, and dispose of all asbestos contained therein. The abatement contractor shall certify that the institution complies with OSHA and HUD requirements for asbestos thresholds. a. MCC New York, 150 Park Row, NY b. N/A