Keyboard shortcuts

/
Search the files
j k
Move through a list of results
[ ]
Previous or next document
g g · G
Top or bottom of the page
Esc
Leave a search field or close this box
?
Show this box

Go to a page: g then

h
Index
t
Timeline
p
People
r
Redactions
x
Explore
w
News
l
Legislation
a
About

Jail record · July 24, 2019

MCC New York daily activity report noting Epstein placed on suicide watch, July 23, 2019

A Metropolitan Correctional Center daily activity report recording Jeffrey Epstein's placement on suicide watch alongside routine staffing, overtime, and inmate counts.Machine-written summary

UNITED STATES GOVERNMENT M E M O R A N D U M METROPOLITAN CORRECTIONAL CENTER New York, NY 10007

July 24, 2019

SUBJECT: Daily Activity Report

Daily Activity as communicated or documented by the Operations Lieutenant for July 23, 2019, was received and/or reviewed. The following information was noted.

Morning Watch Shift:

Lt. reported Control panel inoperative for ES/GS Main Door/Fire Exit doors. Inner Gate inoperative. Fire Watch continues. Call for assistance on 9-South. I/M Epstein #76318-054 placed on Suicide Watch.

Day Watch Shift:

Lt. reported Fire Watch in progress. Correctional assignments 3 Sally Officer, 10-South #2 vacated, due to, a shortage of staff.

Evening Watch Shift:

Lt. reported Fire Watch in progress. Correctional assignments SHU #4, due to, a shortage of staff.

CONFIDENTIAL

SDNY_00012109 EFTA00139839

I/M Burnett #76254-054 at Local Hospice w/USMS Guards

INMATES IN OUTSIDE HOSPITAL/SUICIDE WATCH/FURLOUGH/DRY CELL:

NEW ADMISSIONS TO MCC New York:

Cooper #85972-054

RELEASED FROM MCC NEW YORK:

Cooper #85972-054

ADMISSIONS TO THE SPECIAL HOUSING UNIT:

None

TOTAL NUMBER OF CELLS IN SHU THAT ARE PRESENTLY TRIPLE BUNKED:
None

MISSING FIRE AND SECURITY REPORT:

SIS Office
Central Tool Room
2 Sallyport
Chapel
Recreation
Education
Facilities Shops
Rear Gate

MISSING EQUIPMENT INVENTORY FORM:

Roof Recreation

Rear Gate

THE FOLLOWING LEAVE WAS UTILIUZED:

FURLOUGH: 00

ANNUAL LEAVE: 06

LWOP: 01

SICK LEAVE: 06

ADMIN LEAVE: 00

OFFICIAL TIME: 01

COMP_TIME: 00

SUSPENSION: 01

FFLA: 00

TRAINING: 01

FMLA: 00

GLYNCO: 00

COP: 02

LWOP (M) : 04

TOA: 01

AWOL: 09

EPO: 00

ADVANCE_LEAVE: 00

TRAVEL: 00

CONFIDENTIAL

SDNY_00012110 EFTA00139840

THE FOLLOWING OVERTIMES WERE HIRED:

E-1 OVERTIME:

Number of staff = 23 Hours = 166.30

E-1 COMPTIME:

Number of staff = 03

60-Q OVERTIME (USM MEDICAL) :

Number of Staff = 00Hours = 00.00

B-2 OVERTIME:

Number of Staff = 00 Hours = 00.00

O9D OVERTIME(SPECIAL):

Number of Staff = 00

XXX OVERTIME (AIRLIFT) :

Number of Staff = 00

87S OVERTIME (TREATY TRANS) :

Number of Staff = 00

INSTITUTION TOTALS AT THE BEGINNING OF THE MORNING WATCH SHIFT:

07-23-2019 / 12:00 AM
UNIT B-A:26
UNIT E-N:88
UNIT E-S:86
UNIT G-N:76
UNIT G-S:91
UNIT H-A:00
UNIT I-N:89
UNIT K-N:92
UNIT K-S:139
UNIT Z-A:74
UNIT Z-B:05
TOTAL:776

CONFIDENTIAL

SDNY_00012111 EFTA00139841

MCC New York daily activity report noting Epstein placed on suicide watch, July 23, 2019

Jail records

A Metropolitan Correctional Center daily activity report recording Jeffrey Epstein's placement on suicide watch alongside routine staffing, overtime, and inmate counts.

DOJ Epstein Files, Data Set 9 · July 24, 2019

UNITED STATES GOVERNMENT M E M O R A N D U M METROPOLITAN CORRECTIONAL CENTER New York, NY 10007 July 24, 2019 SUBJECT: Daily Activity Report Daily Activity as communicated or documented by the Operations Lieutenant for July 23, 2019, was received and/or reviewed. The following information was noted. Morning Watch Shift: Lt. reported Control panel inoperative for ES/GS Main Door/Fire Exit doors. Inner Gate inoperative. Fire Watch continues. Call for assistance on 9-South. I/M Epstein 76318-054 placed on Suicide Watch. Day Watch Shift: Lt. reported Fire Watch in progress. Correctional assignmen…