Keyboard shortcuts

/
Search the files
j k
Move through a list of results
[ ]
Previous or next document
g g · G
Top or bottom of the page
Esc
Leave a search field or close this box
?
Show this box

Go to a page: g then

h
Index
t
Timeline
p
People
r
Redactions
x
Explore
w
News
l
Legislation
a
About

Jail record · Aug. 10, 2019

Blank MCC New York daily fire and security inspection report, August 10, 2019

A blank Metropolitan Correctional Center daily fire and security inspection form for the control area, dated August 10, 2019, with no entries.Machine-written summary

EFTA00054993

5500.11A Attachment 1

Metropolitan Correctional Center

New York, New York DAILY FIRE AND SECURITY INSPECTION REPORT

DATE: 8/10/19

AREA: Control

This form will be originated by the first staff member assigned to an area each day and completed by all subsequently assigned staff. The form will be placed in the Security Inspection Form collection box by the Control Center, or delivered to the Lieutenant’s Office each day by staff prior to departing the institution.

SECTION #1

PURPOSE:

The signature of the designated employee indicates he/she has inspected their area of responsibility and conducted the daily area search, and to the best of their knowledge found the following items or areas to be secure. Any discrepancies are to be noted in section #5 and the appropriate action taken to correct the problem, i.e./ work orders, etc.. Significant findings will be reported to the Lieutenants’ Office immediately, and all discrepancies will be noted on a work order.

SECTION #2

BELOW ARE PRIMARY INSPECTION AREAS AND RESPONSIBILITIES:

  1. Shadow boards

  2. Ceilings, access panels & vents

  3. Locking devices & keys

  4. Walls, floors, doors frame

  5. Entrances and exits

  6. Plumbing accesses and locks

  7. Sentry/computers

  8. Fire hazards

  9. Electric boxes, fixtures & cords

  10. Security/emergency lights

  11. Tools and equipment

  12. Storage areas

  13. Doors

  14. Window casings, glass, frame

  15. Bars

  16. Manhole covers/drains

  17. Extinguishers and SCBAs

  18. Utility areas

  19. Telephones

  20. AM Census Check (Note Discrepancies)

  21. PM Census Check (Note Discrepancies)

SECTION #3

AM CENSUS:___

Comments and discrepancies:

PM CENSUS:___

Comments and discrepancies:

SECTION #4

Day Watch Signature
Daily Area SearchStaff ConductingDiscrepancies Noted

COMMENTS OR DISCREPANCIES: ___ ___ ___ ___

Blank MCC New York daily fire and security inspection report, August 10, 2019

Jail records

A blank Metropolitan Correctional Center daily fire and security inspection form for the control area, dated August 10, 2019, with no entries.

DOJ Epstein Files, Data Set 9 · Aug. 10, 2019

EFTA00054993 5500.11A Attachment 1 Metropolitan Correctional Center New York, New York DAILY FIRE AND SECURITY INSPECTION REPORT DATE: 8/10/19 AREA: Control This form will be originated by the first staff member assigned to an area each day and completed by all subsequently assigned staff. The form will be placed in the Security Inspection Form collection box by the Control Center, or delivered to the Lieutenant's Office each day by staff prior to departing the institution. SECTION 1 PURPOSE: The signature of the designated employee indicates he/she has inspected their area of responsibility a…