## UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT'S LOG
Shift-Day-Date: M/W Monday, July 22, 2019Beginning Count: 780SHU: 71/5
M/WDaily Sensitive Information:
I/M at Local Hospice w/USMS Guards
TIMECHRONOLOGICAL EVENTSBCSHU
12:00 AMLieutenant assumes duties as the Morning Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. PREA announcement conducted via the Institution Public Address System and/or Radio. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate/Facilities/R&D. Roof Check completed. All secure. Temporary Chit Inventory: #1:2; #2:5; #3:5; #4:6; #5:5; #6:0; Hosp:078071/5
12:00 AMInstitution Count in progress
12:00 AMNYPD Phone Check #3619
12:20 AMBody Alarm testing in progress
12:40 AMBody alarm testing completed
12:44 AMGood verbal count announced.
12:48 AMGood Verbal count announced
12:30 AMClear Institution count announced78071/5
2:15 AMNYC 311 operator called and stated that they received an anonymous call stating that the Macbullers are planning a stabbing on unit 11 south whenever the unit opens in the morning.
3:00 AMInstitution Count in progress
3:36 AMGood Verbal count announced
3:39 AMClear Institution count announced78071/5
5:00 AMInstitution Count in progress
5:33 AMGood Verbal count announced
5:36 AMClear Institution count announced78071/5
8:00 AMRelieved of duties by Lt. as D/W Operations Lieutenant78071/5
STG International Terrorist phone calls monitored:
WITSEC inquiry(s) was/were received during my tour of duty:
The following Innate(s) were placed in Administrative Detention:
NameReg: NumberReasonUnitTimeAD Order
Ops Lt.Ending Count: 780 SHU: 71; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
SDNY_00008221 EFTA00137584 ## UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG
SHIFT-DAY-DATE: D/W - Monday, July 22, 2019Beginning Count: 780SHU: 71/5
D/W Daily Sensitive Information: I/M at Gold crest nursing facility w/USMS Guards.
8:00 AMLieutenant assumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable at this time. Fire Watch is in Progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:5; #3:5; #4:6; #5:6; #6:5; Hosp:0 Daily Hand Stamp : DJBE/RIGHT HAND78071/5
8:00 AMNYPD Phone Check #1794.
8:04 AMBody Alarm Test Initiated.
8:30 AMAM Census Conducted
8:35 AMI/M Reg out to L-Hosp77971/5
8:36 AMBody Alarm Testing Complete.
11:00 AMMainline Conducted
12:20 PMI/M Reg Return From L-Hosp
12:30 PMPM Census Conducted
1:00 PM-8 I/M77271/5
1:15 PM3 I/M to SHU77274/5
3:34 PM+2 New commit:77574/5
3:45 PMInstitutional lockdown for count.77374/5
4:00 PMRelieved of duties by Lt. as E/W Operations Lieutenant.
Visitation: UNIT 2
InmatesAdultsChildrenTotal
55010
ION SCANNING TESTED HITS: 0
STG/High Alert phone calls monitored: 7
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
NameReg NumberReasonUnitTIMEA/D Order
Weapon PossessionKS1:15 PMYES
Cell Phone PossessionKS1:15 PMYES
SIS InvestigationKS2:45 PMYES
Ops LtEnding Count:775 ; SHU: 74; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00
Act Lt
SDNY_00008222 EFTA00137585 ## UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG
SHIFT-DAY-DATE: E/W - day, July 22, 2019Beginning Count: 775SHU: 74/5
E/WDaily Sensitive Information.
I/M at Goldrest nursing facility w/USMS Guards.
TIMECHRONOLOGICAL EVENTSB/CSHU
4:00 PMLieutenant assumes duties as the Evening Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable Fire Watch is in progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:0; #3:0; #4:0; #5:1; #6:0;77574/5
4:00 PMInstitution count in progress.
4:05 PMNYPD Phone Check #2028.
4:15 PMBody Alarm testing in progress.
4:49 PMBody alarm testing completed.
5:00 PMPressure pump system down Institution will be on Fire Watch protocol until further notice.
5:16 PMGood verbal announced
5:19 PMClear institutional count.77574/5
5:46 PM-1 New commit:77674/5
6:00 PMWatch call in progress
7:50 PMTrash run commenced.
8:15 PMTrash run complete.
10:00 PMInstitutional count in progress.
10:41 PMGood verbal count announced.
10:47 PMClear institutional count announced.77674/5
12:00 AMRelieved of duties by M/W Lieutenant.77674/5
VISITING: 7 South
INMATESADULTSCHILDRENTOTAL
15230745
STG/High Alert phone calls monitored: 5
WITSEC inquiry(s) was/were received during my tour of duty: 0
The following Inmate(s) were placed in Administrative Detention: 0
NAMEREG NUMBERREASONUNITTIMEA/D ORDER
Ops. Lt.
Act. Lt.
Ending Count:776 ; SHU: 74; 10-South: 05; SHU OBS: 00;
Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00;
B/A SHU: 00
SDNY_00008223 EFTA00137586