EFTA00072923 [1] 2008年12月26日,中国石油天然气股份有限公司北京销售分公司在北京西单大悦城B座3层C座1001室发生爆炸,造成5人死亡,20余人受伤。 EFTA00072924 ## SEPTEMBER (Check list to be completed and signed by 28th September) □ Faucets - Check for leaking faucets. Replace washers if necessary. □ Bathtub drain assembly – Clean out debris; inspect rubber seal; replace if necessary. Shower drain assembly – Clean out debris and scrub strainer. □ Range hood fan – Clean grease filter. □ Dishwasher - Run the unit with a quart of white vinegar added to the tank. This removes any deposits left behind in the tub and helps keep the drain clear. □ Hinges and locks – Lubricate as needed. □ Awnings – Lower and clean. Check motor. DATE: ___ 2/14/2005 SIGNATURE: ___ 45 EFTA00072925 ## OCTOBER (Check list to be completed and signed by $ 28^{\text{th}} $ October) Toilets – Check for leaks in flushing mechanism; repair if necessary. □ Interior caulking – Inspect caulking around bathtubs, showers and sinks; replace if deteriorating. [ ] Washing machines – Clean water inlet filters; check hoses for leaks and replace if necessary. □ Clothes dryers – Vacuum lint from ducts and surrounding areas. □ Refrigerator – Wash and check door gasket; clean condenser coils with a gentle brush. □ Range hood fan – Wash fan blades and housing. Wiring – Check for frayed cords and wires; repair if necessary. Hot water heating system – Lubricate circulating pump and motor. Foundation – Check for cracks and moisture, repair if necessary. □ Roof – Inspect roof surface; repair if necessary. [ ] Gutters and downspout – Clean out, inspect and repair weaknesses; check for proper drainage and adjust if necessary. □ Exterior caulking – Inspect caulking and replace if deteriorating.
| Window sills, door sills and thresholds - Fill cracks, caulk edges and repaint; replace if necessary |