THEATER EQUIP

11-May-19 Contractor’s Name John Bedminster
We have received proposals for demolition of the existing and construction
of the new Little St. James Flag Pole Pool Cabana - Shaded Roof. There was
guite a variance in the scopes so we have taken the liberty of listing what we expect from
the contractor during this project. The list is as follows:
1. Prepare a working drawing. (Architectural quality is not necessary.)
2. General conditions shall be included as part of the line items (not separately).
3. Proposals shall have schedule of values based upon activities listed below:
Demailtion of Existing Roof V 2.500.00
Demolition of Existing Columns V 600.00
Demolition of Existing Tile Within Footprint 5 2.100.00
Provide Dumpsters Located at Owner’s Direction 5 1,800.00
(Barge for Dumpster Hauls Provided by Owner) 5
Excavate & Pour 8 New Column Footings 5 3,000.00
Form & Pour 8 New Columns 5 4,000.00
Form & Pour Bond Beam (Alt. Steel Beam Acceptable) 5 4,350.00
Strip & Remove All Formwork 5 1.500.00
Frame Roof with 3”x8” rafters & 3”x10” hips 4/12 Pitch 5 9,500.00
Install 2”x12” Fascia Board Around Roof Perimeter VA 850.00
Install One Layer of 3/4” PT Plywood Decking to Rafters 5 1.129.00
Install Ice & Water Shield to Plywood 5 1.800 00
Install Copper Flashing/Drip Edge to Match Existing 5 580.00
Install Concrete Roof Tile S 7.500.00
Install & Plaster Durock Ceiling 5 6,500.00
Plaster All exposed Concrete Columns & Beams 5 4,344.00
Install New Coral Stone Tile Per Owner’s Instructions 5 4,800.00
Working drawings 5 7,000.00
5 3.500.0
353.0

THEATER 3

Pro L1505U

to be signed by the contractor and owner.

AULS

EFTA00001584

LASER